|
Sister Sites
Noise Control
Anechoic Chambers
Sound Level
Meters
Audiology Rooms
Noise At Work
School Acoustics
|
|
Installation Instructions EZ-Hang
|
| |
Required
Tools
- Center Punch
- Drill
- Drill Bits : 8mm, 3.5mm
- Extension Cord
- Hammer
- Level (1m minimum)
- Level Bar
- Needle Nose Pliers
- Pen Pencil
- Plumb Bob
- Screw Driver, Slotted
- Tape Measure
- Tap 1/4" - 20 NC
Next Step
|
|